One of the most frequently asked questions we receive is: When is the best time to build a pool in Spain? The answer might surprise you: Fall and winter—between September and March—are the best months to start a pool construction project. In this article, we’ll explain why and what practical advantages there are to building off-season.

Why NOT Build Your Pool in Spring or Summer

It’s understandable that when the heat arrives, you’ll want your pool ready for summer. However, requesting quotes in April or May to have your pool ready by July is an idea that rarely works out. Pool companies are swamped with work from May through August, which means:

Month-long waiting lists: The best installers have their schedules fully booked as early as January or February. If you contact them in the spring, they most likely won’t be able to start your project until after the summer.

Higher prices: The law of supply and demand also applies to the pool industry. During peak demand months, prices are typically 10–20% higher than in the off-season.

Less attention to detail: When installers are working at full capacity on several projects at once, the quality of supervision may suffer.

The Advantages of Building Between September and March

The fall and winter months are the best times to start building your pool for several reasons:

Greater availability of installers: During the off-season, pool companies have fewer active projects and can devote more attention and resources to your project. This translates to better workmanship and more predictable timelines.

Better weather conditions for concrete: Although it may seem counterintuitive, the moderate temperatures of fall and winter (between 10 and 20°C) are ideal for concrete curing. High summer temperatures can cause the concrete to set too quickly, increasing the risk of cracks.

More competitive prices: Many companies offer off-season discounts to keep their workforce active. It’s common to get more favorable terms between October and February.

Ready for Summer: If you start in September or October, your pool will be completely ready—with all permits in place and the water perfectly treated—by the time the first heat of May or June arrives.

Permit Procedures and Timelines

Another factor that many homeowners don’t take into account is how long municipal permits can take. Depending on the municipality and the autonomous community, a building permit for a pool can take between 1 and 6 months to be granted.

If you apply for the permit in October, you’ll most likely receive it in December or January and can start construction immediately. If you apply in March hoping to have the pool ready by July, the administrative delays could cause you to miss the entire season.

The Climate in Spain: Regional Advantages

In most of Spain, fall and winter do not pose a weather-related obstacle to pool construction. In regions such as Andalusia, Murcia, the Valencian Community, or the Canary Islands, winter temperatures are mild enough to allow for comfortable work year-round.

Even in inland areas with harsher winters, excavation and structural work can be carried out in the fall, leaving the final finishing touches (waterproofing with reinforced membrane, equipment installation) for when the weather improves in February–March.

Ideal Planning Schedule

To have your pool ready by June of next year, we recommend following this schedule:

July–August: Research and contact companies. Request quotes and schedule initial site visits.

September: Select a contractor and sign the contract. Begin the permit application process.

October–November: Excavation and concrete structure.

December–January: Installation of plumbing, electrical systems, and waterproofing with reinforced membrane.

February–March: Installation of equipment, lighting, and exterior finishes.

April–May: Filling, water balancing, and commissioning. Ready for summer!

At ArgPiscinas, we accept projects year-round and offer special rates during the off-season. If you’re thinking about building a pool, visit argpiscinas.es and request a no-obligation quote. The sooner you start planning, the better the final result will be.